Amphitheatre 1 covered !

The first stairs have been delivered and set up.
We finally can get a view from the sono boost, 5 easy steps above the balcony.
We have been told that there is a miss in term of handicap access: the last five steps are not doubled with a side lift for wheel chair ,maybe it was removed during the recession ...?
The metallic frame of the stairs to the 2nd floor are up.
In less than a year, this view won't exist anymore. Gigantic walls covered with accoustic plaster panels will separate the stair way from the amphitheatre. A curved ceilling with incrusted lights will lite the volume with 400 lux. And a blue line of neon on the perimetre of the space will give the impression that the ceiling floats...
I am anxious to see the other contrators on site. Today only the concrete, and metallic structure operations are on. The electrician is right behing these guys and makes sure they work with the light on. He also makes sure the main cables are laid down before the concrete is poured...
This is a 3D preview: