The E Building

The program asked us to keep the original structure - this is what's left of it after engineering controls.
It will be consolidated and rebuilt with the identical volumes. The 4th and 5th floor will be connected to the F building by a covered wolkway .

0 Comments:
Post a Comment
<< Home